DER Interconnection Studies

Project Detail

Project Location: Illinois

Challenge:

  • Conduct comprehensive interconnection studies for DER projects in compliance with ICC requirements.
  • Evaluate the feasibility of interconnection and identify required grid infrastructure upgrades.

Action:

  • Conducted pre-application studies and Level 1-4 technical reviews to assess the impact of DERs on the grid.
  • Performed system impact assessments to identify required grid modifications and developed cost estimates for upgrades.
  • Developed one-line diagrams and project diagrams to illustrate proposed system upgrades.
  • Utilized Smartsheet/Excel for real-time collaboration and updates visible to all stakeholders.
  • Implemented KPIs to measure communication effectiveness, including response times, meeting participation, and issue resolution.

DST Value Addition:

  • DST provided data, maps, charts, and calculations in a format easily accessible by the client.
  • DST successfully identified necessary grid upgrades and provided cost estimates for DER integration.
  • Throughout the project, DST ensured smooth communication and documentation, meeting regulatory and technical requirements for DER interconnection.