DER Interconnection Studies
Project Detail
Project Location: Illinois
Challenge:
- Conduct comprehensive interconnection studies for DER projects in compliance with ICC requirements.
- Evaluate the feasibility of interconnection and identify required grid infrastructure upgrades.
Action:
- Conducted pre-application studies and Level 1-4 technical reviews to assess the impact of DERs on the grid.
- Performed system impact assessments to identify required grid modifications and developed cost estimates for upgrades.
- Developed one-line diagrams and project diagrams to illustrate proposed system upgrades.
- Utilized Smartsheet/Excel for real-time collaboration and updates visible to all stakeholders.
- Implemented KPIs to measure communication effectiveness, including response times, meeting participation, and issue resolution.
DST Value Addition:
- DST provided data, maps, charts, and calculations in a format easily accessible by the client.
- DST successfully identified necessary grid upgrades and provided cost estimates for DER integration.
- Throughout the project, DST ensured smooth communication and documentation, meeting regulatory and technical requirements for DER interconnection.